
6 Interaction devices
Z
In case of multiple assignments (i.e. one hand geometry is to be as-
signed to more than one hand target calibration) a warning message
will pop up. Delete the current assignment prior to re-assigning.
Import / Export of hand geometries
You can also import previously saved hand ge-
ometries by pressing the button ’
Load
’. A window will open to select the respective folder.
Choose the appropriate file and press ’
OK
’.
In order to export hand geometries just press ’
Save
’ and select the hand geometries you
would like to export in the upcoming window. Press ’
Save
’ again, select the location of
the respective folder and choose an appropriate file name.
You can also remove entries from
available hand geometries
by left-clicking and pressing
’
Delete
’.
6.4.6.3 Fingertracking Body calibration via Target Library
Open the sub-dialogue
Fingertracking
→
Body Calibration via Target Library
to assign the
corresponding body calibration of each hand target to a selected
Hand ID
. All hand tar-
get body calibrations stored in the target library are shown on the right side of the window.
Figure 6.21: Fingertracking Administration - Body Calibration Target library
i
The integrated target library contains most hand target calibrations of
ART
Fingertracking hardware. Perform a custom body calibration only
when the hand target cannot be identified automatically.
The body calibration can be assigned to a selected
Hand ID
the following way:
•
turn on one Fingertracking device and place it inside the tracking volume
•
run the target library identification by pressing
Calibrate
. The
Short Name
of the
corresponding hand target will be marked green
•
mark the respective
Hand ID
from row ’
H1...H4
’ under
selected hands
by left-clicking
94
Содержание Flystick3
Страница 220: ...10 General Information 10 4 Declaration of conformity 220 ...
Страница 221: ...10 4 Declaration of conformity 221 ...
Страница 222: ...10 General Information 222 ...
Страница 223: ...10 4 Declaration of conformity 223 ...
Страница 224: ...10 General Information 224 ...
Страница 233: ...10 4 Declaration of conformity 233 ...
Страница 234: ...10 General Information 234 ...
Страница 235: ...Appendix 10 4 Declaration of conformity 235 ...
Страница 248: ...A Technical specifications ARTTRACK2 discontinued ARTTRACK3 discontinued TRACKPACK discontinued 248 ...
Страница 249: ...Appendix A A 7 System latency TRACKPACK Cascade discontinued 249 ...
Страница 269: ...Appendix B B 3 Input of Special Control Data via Ethernet tfb 2 0 0 1 0 0 5 0 1 0 8 0 5 269 ...