
9 Frequently asked questions (FAQ)
How do I guide the synchronization cables correctly in cascaded systems ?
•
When using one
TRACKPACK/E
master and one
TRACKPACK/E
slave controller
the correct cabling would look as follows:
•
When using one
ART
Controller as master and two
TRACKPACK
slave controller
the correct cabling would look as follows:
Synchronization failed in
ARTTRACK
2 & 3 systems (discontinued)
Here we have to distinguish between hardware issues (camera and external synchroniza-
tion) and software issues:
1. Check the cabling (hardware issue):
•
Please make sure that the cables themselves are not damaged.
•
Take care of using the correct ports:
–
OUT1 to OUT3: synchronization of the cameras
–
EXT.In: input of the external synchronization
•
Double-check if no extensions between camera and terminating resistor have
been made.
198
Содержание Flystick3
Страница 220: ...10 General Information 10 4 Declaration of conformity 220 ...
Страница 221: ...10 4 Declaration of conformity 221 ...
Страница 222: ...10 General Information 222 ...
Страница 223: ...10 4 Declaration of conformity 223 ...
Страница 224: ...10 General Information 224 ...
Страница 233: ...10 4 Declaration of conformity 233 ...
Страница 234: ...10 General Information 234 ...
Страница 235: ...Appendix 10 4 Declaration of conformity 235 ...
Страница 248: ...A Technical specifications ARTTRACK2 discontinued ARTTRACK3 discontinued TRACKPACK discontinued 248 ...
Страница 249: ...Appendix A A 7 System latency TRACKPACK Cascade discontinued 249 ...
Страница 269: ...Appendix B B 3 Input of Special Control Data via Ethernet tfb 2 0 0 1 0 0 5 0 1 0 8 0 5 269 ...