INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE
安装和维护说明手册
D0578-02-ZH
11/100
AREVA T&D S.p.A. – Via Meucci, 22 30020 Noventa di Piave (VE) ITALY – Tel. : 39 0421 309511 – Fax : 39 0421 65254
Subsidiary of AREVA T&D Italy SpA (AREVA group) with registered office in Via Meucci, 22 30020 Noventa di Piave (VE) - ITALY, under Art. 2359 of the Italian Civil Code.
If the equipment is stored outdoors or in a moist (damp) warehouse, follow
the recommendations of paragraph 4.2.1 and also connect the anti-
condensation heaters of the drive to a power supply and keep them
energized.
如果设备在户外或在潮湿的仓库中存放,请按
4.2.1
节推荐的方案处理,并保
持操动机构内的防凝加热器的电源接通。
5.
UNPACKING AND LIFTING
开箱与吊运
Unpack the materials with care in order to avoid loosing or damaging any items.
小心地打开包装,避免丢失或毁损物件。
Handle the complete units taking care especially of porcelain insulators even if
already assembled.
搬运各单元时,要特别小心,尤其是陶瓷绝缘子,即使组装好了亦应如此。
Open the shipping cases on site just before installation, in a position where the
hoisting equipment may hook the materials with ease.
请在安装前于安装现场开箱,开箱位置应确保吊装设备可以方便地进行起吊。
Sling the material with an adequate lifting apparatus as shown in figure A.
按图
A
所示,以适当的器具用绳索将物件吊起。