49
EN
CONTENTS
SYMBOLS AND PERSONNEL QUALIFICATIONS
Machine conforming to CE standards
Machine tests carried out by the manufacturer
RISKS, PROHIBITIONS, OBLIGATIONS
DESCRIPTION OF THE MACHINE AND ITS USE
Preservation of the machine before a long period of disuse
Storage of the unpacked machine
HANDLING AND INSTALLING THE MACHINE
Lifting and moving the machine :
Fastening the machine to the floor:
Connection to the power supply
Cleaning the body of the machine
Cleaning the inside of the bowl and the mixing tools
Loading the ingredients to be kneaded
Warnings relative to repeated interruptions of a work cycle
PERIODICAL INSPECTIONS, CLEANING AND MAINTENANCE OF THE MACHINE
Cleaning procedures and periodical inspections
Inspection of the safety devices
WEEKLY, MONTHLY, ANNUAL Maintenance procedures
Adjustment of the belt tension and replacement of the transmission belts
DESCRIPTION AND MAINTENANCE OF THE HYDRAULIC UNIT
Description of the hydraulic unit
DISASSEMBLING AND DISPOSING OF THE MACHINE
Содержание BAKERY Line L 120
Страница 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Страница 4: ...4 RU 1 2 3 4 5 6 I II...
Страница 5: ...5 RU 1...
Страница 6: ...6 RU...
Страница 7: ...7 RU 2 GOST R GOST R 2 2...
Страница 8: ...8 RU 3 N B 4...
Страница 9: ...9 RU 70 A...
Страница 10: ...10 RU 4...
Страница 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Страница 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Страница 13: ...13 RU 2 1 6 20 40 C 90...
Страница 14: ...14 RU 7 800 800 A 4...
Страница 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Страница 16: ...16 RU 3 A A A M5 M5...
Страница 17: ...17 RU 5 40 C 90 8...
Страница 18: ...18 RU 9 2 2 1 2 3 1...
Страница 19: ...19 RU O...
Страница 20: ...20 RU 10 O...
Страница 21: ...21 RU O...
Страница 23: ...23 RU 3...
Страница 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Страница 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Страница 27: ...27 RU 1...
Страница 28: ...28 RU Reverse 1 NORMAL...
Страница 29: ...29 RU...
Страница 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Страница 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Страница 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Страница 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Страница 36: ...36 RU 3...
Страница 37: ...37 RU...
Страница 38: ...38 RU B C B C A A I II...
Страница 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 41: ...41 RU 2a C 4...
Страница 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Страница 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Страница 45: ...45 RU...
Страница 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Страница 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Страница 100: ...100 EN APPENDIX 4 WIRING DIAGRAMS 80 120 L L R IN 400V 50HZ WITH with two electro mechanical timers SITEC 72x72...
Страница 101: ...101 EN...
Страница 102: ...102 EN...
Страница 103: ...103 EN...
Страница 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Страница 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Страница 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Страница 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Страница 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Страница 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Страница 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...