95
EN
5. SYSTEM STARTING
Where pump-suction cocks are fitted, make sure that they are open. The pump rotation direction must be as
prescribed and coincide with the electric-motor rotation direction. The piston pump-body must be filled through
the draining duct. Set the maximum pressure valve or by-pass valve to venting in order to start the pump loadless.
Start the electrical pulse motor to help pump priming until the noise becomes regular.
Gradually increase the pressure regulation to fill the system, proceed to bleeding air from the cylinders by means of
suitable bleeder screws or simply connection fittings. Air emission is revealed by the presence of foam in the oil.
The bleeding and fitting-tightness check operation must last no less than ten minutes. After rechecking the tank oil
level, bring the system to the required performance standard.
6. MAINTENANCE
Maintenance is an issue which must be taken into account ever since the designing stage, by planning for pressure
measurements points, cocks helping filter replacement and accessibility to the various components.
Ordinary maintenance must be carried out once a week, with the following operations:
External cleaning
Checking tightness of fittings and components
Checking tank oil level, air filter (tank breathers)
Temperature in the tank and components
Precharge pressure of accumulators using appropriate instruments
Once every six months, cleaning of the heat exchanger in relation to the type of water used.
Oil replacement depends on various factors, such as working temperature, pressure and pollution level.
It is usually recommended to replace the oil after 3000 to 5000 hours of operation, then to clean the tank and, if
necessary, wash the system.
Extraordinary maintenance is difficult to forecast, since the various components have different working lives, for
example:
pumps = 5000 to 10000 hours
piping = 10000 hours or depending on wear
solenoid valves = 5 million manoeuvres
cylinders = 1 million strokes
It is very important to avoid too much stress on the various components, when not required by performance
standards, i.e. the load can absorb 80 bar, the overpressure valve must not be brought above an additional 15-20%.
For fast maintenance, it is advisable to be equipped with a set of essential spare parts, which must be continuously
replaced.
Содержание BAKERY Line L 120
Страница 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Страница 4: ...4 RU 1 2 3 4 5 6 I II...
Страница 5: ...5 RU 1...
Страница 6: ...6 RU...
Страница 7: ...7 RU 2 GOST R GOST R 2 2...
Страница 8: ...8 RU 3 N B 4...
Страница 9: ...9 RU 70 A...
Страница 10: ...10 RU 4...
Страница 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Страница 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Страница 13: ...13 RU 2 1 6 20 40 C 90...
Страница 14: ...14 RU 7 800 800 A 4...
Страница 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Страница 16: ...16 RU 3 A A A M5 M5...
Страница 17: ...17 RU 5 40 C 90 8...
Страница 18: ...18 RU 9 2 2 1 2 3 1...
Страница 19: ...19 RU O...
Страница 20: ...20 RU 10 O...
Страница 21: ...21 RU O...
Страница 23: ...23 RU 3...
Страница 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Страница 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Страница 27: ...27 RU 1...
Страница 28: ...28 RU Reverse 1 NORMAL...
Страница 29: ...29 RU...
Страница 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Страница 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Страница 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Страница 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Страница 36: ...36 RU 3...
Страница 37: ...37 RU...
Страница 38: ...38 RU B C B C A A I II...
Страница 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 41: ...41 RU 2a C 4...
Страница 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Страница 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Страница 45: ...45 RU...
Страница 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Страница 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Страница 100: ...100 EN APPENDIX 4 WIRING DIAGRAMS 80 120 L L R IN 400V 50HZ WITH with two electro mechanical timers SITEC 72x72...
Страница 101: ...101 EN...
Страница 102: ...102 EN...
Страница 103: ...103 EN...
Страница 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Страница 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Страница 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Страница 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Страница 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Страница 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Страница 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...