61
EN
B A
The information concerning the gross weight appears on the outside of the packaging.
Once the outer packing material has been removed, in order to unpack the machine, it is necessary to
remove the 4 screws fastened to the 4 feet of the machine.
All the material used for the packaging can be recycled or disposed of as ordinary urban waste.
Lifting and moving the machine :
a) Lifting the machine with packaging
Before starting, check the total weight of the machine with packaging and then use appropriate
equipment to lift the packed machine. In the case when a fork lift truck is used, the machine must be
lifted by inserting the forks into the pallet.
b) Lifting the machine without packaging
Carefully remove the head cover of the machine.
Position and securely fasten four eyebolts into the four M16 holes inside the mixer head.
Insert a tie-rod with hook into the eyebolts and connect the tie-rods to suitable lifting equipment.
Fastening the machine to the floor:
Note: The floor, especially in the front part (where the carriage is located) must be extremely level. For
safety reasons, the machine feet must be fastened to the floor.
To fix the machine to the floor use 4 expansion inserts of diameter 10-12 mm passing them through the
four holes (A) provided in the machine feet.
Содержание BAKERY Line L 120
Страница 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Страница 4: ...4 RU 1 2 3 4 5 6 I II...
Страница 5: ...5 RU 1...
Страница 6: ...6 RU...
Страница 7: ...7 RU 2 GOST R GOST R 2 2...
Страница 8: ...8 RU 3 N B 4...
Страница 9: ...9 RU 70 A...
Страница 10: ...10 RU 4...
Страница 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Страница 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Страница 13: ...13 RU 2 1 6 20 40 C 90...
Страница 14: ...14 RU 7 800 800 A 4...
Страница 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Страница 16: ...16 RU 3 A A A M5 M5...
Страница 17: ...17 RU 5 40 C 90 8...
Страница 18: ...18 RU 9 2 2 1 2 3 1...
Страница 19: ...19 RU O...
Страница 20: ...20 RU 10 O...
Страница 21: ...21 RU O...
Страница 23: ...23 RU 3...
Страница 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Страница 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Страница 27: ...27 RU 1...
Страница 28: ...28 RU Reverse 1 NORMAL...
Страница 29: ...29 RU...
Страница 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Страница 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Страница 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Страница 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Страница 36: ...36 RU 3...
Страница 37: ...37 RU...
Страница 38: ...38 RU B C B C A A I II...
Страница 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 41: ...41 RU 2a C 4...
Страница 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Страница 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Страница 45: ...45 RU...
Страница 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Страница 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Страница 100: ...100 EN APPENDIX 4 WIRING DIAGRAMS 80 120 L L R IN 400V 50HZ WITH with two electro mechanical timers SITEC 72x72...
Страница 101: ...101 EN...
Страница 102: ...102 EN...
Страница 103: ...103 EN...
Страница 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Страница 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Страница 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Страница 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Страница 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Страница 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Страница 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...