70
EN
Adjustment of the belt tension and replacement of the transmission belts
The tension of the transmission belts must be adjusted when the rotation of the spiral tool/bowl slows
down or is not smooth during the execution of a work cycle.
It is obligatory to:
wear protective clothing suitable for the task to be carried out,
switch off the machine and disconnect it from the power supply, before carrying
out any operation on the machine.
The procedure for the adjustment of the belt tension and replacement of the transmission belts is
described in Appendix 3.
Note: Before replacing the belts, ensure that the new belts have the same characteristics as the original
belts installed on the machine by the manufacturer.
11. DESCRIPTION AND MAINTENANCE OF THE HYDRAULIC UNIT
Any type of intervention on the machine must be carried out by suitably
qualified personnel, using suitable equipment and in accordance with the
local safety standards and regulations in force!
Before carrying out any operation on the machine, it is obligatory to:
wear protective clothing suitable for the task to be carried out,
switch off the machine (by turning off the main switch) and
disconnect the machine from the power supply, ensuring that the
electrical panel on the machine and the machine power cable are isolated
from the main power supply in a safe manner for the entire duration of
the intervention, without accidental risk of re-energising of the power
supply.
11.1 Description of the hydraulic unit
Part number:
R06001
Motor:
0,75 kW
Type of pump:
"N" PHC 1-3,8 cm3/g x MC
Working pressure:
110 bar
Access can only be gained to the hydraulic unit after having removed the corresponding machine
column casing.
Refer to the attached hydraulic unit manual supplied by the hydraulic unit manufacturer for additional
instructions realtive to the maintenance.
Содержание BAKERY Line L 120
Страница 2: ...RU O KATHO L 80 120 2 2020 2 400 50 3 8 75 A 22 1 CE Equip Group...
Страница 4: ...4 RU 1 2 3 4 5 6 I II...
Страница 5: ...5 RU 1...
Страница 6: ...6 RU...
Страница 7: ...7 RU 2 GOST R GOST R 2 2...
Страница 8: ...8 RU 3 N B 4...
Страница 9: ...9 RU 70 A...
Страница 10: ...10 RU 4...
Страница 11: ...11 RU 5 55 2 2 9 10 4 13 5 3 8 6 12 1 7 11...
Страница 12: ...12 RU 1 2 3 5 3 3 4 5 5 13 80 120 13 160 280 10 6 7 11 8 9 2 9 12...
Страница 13: ...13 RU 2 1 6 20 40 C 90...
Страница 14: ...14 RU 7 800 800 A 4...
Страница 15: ...15 RU 4 4 a M16 4 10 12 A A A...
Страница 16: ...16 RU 3 A A A M5 M5...
Страница 17: ...17 RU 5 40 C 90 8...
Страница 18: ...18 RU 9 2 2 1 2 3 1...
Страница 19: ...19 RU O...
Страница 20: ...20 RU 10 O...
Страница 21: ...21 RU O...
Страница 23: ...23 RU 3...
Страница 24: ...24 RU 11 11 1 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 25: ...RU 11 2 EV4 EV3 EV1 EV2 SP1 SP2 90 EV SP1 SP2 25...
Страница 26: ...26 RU 12 1 1 2 3 2 I 3 4 4 5 5 1 1 2 2 1 1 1 1 2 2 1 1 2 2 13 PET ABS PST o o...
Страница 27: ...27 RU 1...
Страница 28: ...28 RU Reverse 1 NORMAL...
Страница 29: ...29 RU...
Страница 30: ...30 RU 1 LED 1 2 LED 1 1 2 2 LED 1 1 O 1 2...
Страница 31: ...31 RU 1 2 1 1 1 O 1 2 2 2...
Страница 32: ...32 RU 1 2 1 1 O 1 1 2 2 2 2 2...
Страница 33: ...33 RU 1 2 Reverse 1 1 5 2 backup O 1 2...
Страница 36: ...36 RU 3...
Страница 37: ...37 RU...
Страница 38: ...38 RU B C B C A A I II...
Страница 39: ...39 RU 6 R06001 0 75 N PHC 1 3 8 3 x MC 110...
Страница 41: ...41 RU 2a C 4...
Страница 42: ...42 RU 5 6 3000 5000 5000 10000 10000 5 1 80 15 20...
Страница 43: ...43 RU 1 1 2 3 2 5 11 4 3 4 5 5 6 7 6 8 9 10 7 11 8 9 10 11 12 12 13 5 14 9 15 13 6 14 15...
Страница 45: ...45 RU...
Страница 76: ...76 EN DESCRIPTION OF THE ELECTRONIC CONTROL PANEL...
Страница 98: ...98 EN HYDRAULIC WIRING DIAGRAM...
Страница 100: ...100 EN APPENDIX 4 WIRING DIAGRAMS 80 120 L L R IN 400V 50HZ WITH with two electro mechanical timers SITEC 72x72...
Страница 101: ...101 EN...
Страница 102: ...102 EN...
Страница 103: ...103 EN...
Страница 109: ...109 EN 2 ASSIEME RUOTA FRIZIONE L 80 120 EXPLODED VIEW FOR FRICTION WHEEL L 80 120...
Страница 111: ...111 EN 3 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL GROUP...
Страница 117: ...117 EN 8 ASSIEME BASAMENTO BASE ASSEMBLY...
Страница 119: ...119 EN 9 ASSIEME IMPIANTO IDRAULICO HYDRAULIC SYSTEM ASSEMBLY...
Страница 121: ...121 EN 10 ASSIEME PANNELLO COMANDI CONTROL PANEL ASSEMBLY...
Страница 123: ...123 EN 11 ASSIEME CARRELLO BOWL TROLLEY ASSEMBLY...
Страница 126: ...Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...