Installation
|
3-1
INSTAllATION
The operations in this chapter should only be performed by qualified
service personnel experienced with electrical safety techniques. There are
no operator serviceable components inside the system, and an operator
should not attempt to open the sensor or controller cover for any reason.
Qualified service personnel should never service the controller or sensor
unless power has been removed from the controller and sensor, and the
sensor has been allowed to cool for at least one hour. Also, always use
gloves when working on the sensor because sensor components remain
hot even after power has been removed.
This chapter shows you how to install your sensor components, and in-
cludes the following sections:
• Inspect Shipping Contents
• Mechanical Installation
• Wiring
• Options Module Installation
Содержание Thermox CEM O2/TM
Страница 12: ...xii Thermox CEM O2 TM This page intentionally left blank...
Страница 45: ...Installation 3 23 Figure 3 20 Current output connections example...
Страница 47: ...Installation 3 25 Figure 3 21 Series 2000 standard alarm connections...
Страница 49: ...Installation 3 27 Figure 3 22 Series 2000 controller RCU connections...
Страница 51: ...Installation 3 29 Figure 3 23 Series 2000 2 wire RS 485 communications connections...
Страница 53: ...Installation 3 31 Figure 3 24 Series 2000 4 wire RS 485 communications connections...
Страница 56: ...3 34 Thermox CEM O2 TM This page intentionally left blank...
Страница 116: ...5 26 Thermox CEM O2 TM This page intentionally left blank...
Страница 137: ...Service and Parts 7 3 This page intentionally left blank...
Страница 139: ...Service and Parts 7 5 Figure 7 1 Cell replacement...
Страница 143: ...Service and Parts 7 9 Figure 7 3 Furnace replacement...
Страница 162: ...B 4 Thermox CEM O2 TM This page intentionally left blank...
Страница 166: ...C 4 Thermox CEM O2 TM This page inentionally left blank...
Страница 168: ...D 2 Thermox CEM O2 TM This page intentionally left blank...