![Amazone AD 3000 Super Classic Line Скачать руководство пользователя страница 84](http://html1.mh-extra.com/html/amazone/ad-3000-super-classic-line/ad-3000-super-classic-line_operating-manual_2919699084.webp)
Initial operation
84
AD 3000 Super BAH0107-0 02.20
6.1
Checking the suitability of the tractor
WARNING
Danger of breaking during operation, insufficient stability and
insufficient tractor steering and braking power on improper use
of the tractor!
Check the suitability of your tractor before you mount or hitch the
implement onto the tractor.
You may only connect the implement to tractors suitable for the
purpose.
Carry out a brake test to check whether the tractor achieves the
required braking delay with the machine connected.
Requirements for the suitability of a tractor are, in particular:
the permissible total weight
the permissible axle loads
the permissible drawbar load at the tractor coupling point
the load capacity of the installed tyres
the permissible trailer load must be sufficient.
You can find this data on the rating plate or in the vehicle
documentation and in the tractor operating manual.
The front axle of the tractor must always be loaded with at least 20 %
of the tare weight of the tractor.
The tractor must achieve the brake delay specified by the tractor
manufacturer, even with a mounted or trailed implement.
Содержание AD 3000 Super Classic Line
Страница 2: ......
Страница 9: ...AD 3000 Super BAH0107 0 02 20 9 ...
Страница 77: ...Structure and function AD 3000 Super BAH0107 0 02 20 77 Fig 72 ...
Страница 196: ......
Страница 197: ......