![Amazone AD 3000 Super Classic Line Скачать руководство пользователя страница 182](http://html1.mh-extra.com/html/amazone/ad-3000-super-classic-line/ad-3000-super-classic-line_operating-manual_2919699182.webp)
Maintenance and repairs
182
AD 3000 Super BAH0107-0 02.20
12.4.3 Folding up the lay shaft
4. Fold up the lay shaft.
When doing so, insert the bracket (Fig.
219/1) that secures the lay shaft in an axial
position into the recess of a seed housing.
5. Secure the bracket axially with two set
collars (Fig. 219/2).
Fig. 219
6. Mesh the teeth (Fig. 220/1) of the drive
pinion and the tramline fine seed metering
wheels.
7. Tighten the hexagon socket screws (Fig.
220/1) of the drive pinion in the notch of the
lay shaft without tension.
Fig. 220
8. Mesh the cogs (Fig. 221/1) of the lay shaft
coupling and the seeding shaft spur gear.
9. Hook in the tension springs (Fig. 221/2) on
the pivot bearings (Fig. 221/3).
10. Check that the seed metering wheel
tramline control is working.
Fig. 221
Содержание AD 3000 Super Classic Line
Страница 2: ......
Страница 9: ...AD 3000 Super BAH0107 0 02 20 9 ...
Страница 77: ...Structure and function AD 3000 Super BAH0107 0 02 20 77 Fig 72 ...
Страница 196: ......
Страница 197: ......