C o m m i ssion ing M anu al
D ef i n i n g S yn ch r o n i z at i o n
3.
4.
5.
6.
7.
Ensure that the correct frequency table ID appears in the
Frequency Table ID
field. This must be identical for all BSRs at the Base Station.
In the
Synchronization Ring Phase
field, enter the index of the frequency on
which the BSR starts transmitting when a synchronization pulse is received from
the BSDU. This must be unique for each BSR that is connected to the BSDU(s).
From the
Hop Length
drop-down list, select the time data is "hopped" from one
frequency to the next:
Regular Hop Length:
± 50 msec
Short Hop Length:
25 msec.
Click
Apply
.
Perform Steps 1 through 6 for BSR
10.0.0.14
. The Hopping Configuration
dialog box for BSR
10.0.0.14
is displayed below, showing its
Synchronization
Ring Phase
field value defined as
4
:
Figure
21-13: Enabling synchronization for BSR 10.0.0.14 (phase = 4)
01040311-07
Airspan Networks Inc.
21-17
Содержание AS3010
Страница 4: ...This page is intentionally left blank ...
Страница 16: ...Contents Commissioning Manual This page is intentionally left blank xvi Airspan Networks Inc 01040311 07 ...
Страница 48: ...Installing ASWipLL Management Software Commissioning Manual 5 Click Next 2 4 Airspan Networks Inc 01040311 07 ...
Страница 318: ...Managing Bandwidth Commissioning Manual This page is intentionally left blank 11 10 Airspan Networks Inc 01040311 07 ...
Страница 330: ...Defining Virtual Ports Commissioning Manual This page is intentionally left blank 13 6 Airspan Networks Inc 01040311 07 ...
Страница 372: ...Defining Air Subnets Commissioning Manual This page is intentionally left blank 15 20 Airspan Networks Inc 01040311 07 ...
Страница 390: ...Defining PPPoE Commissioning Manual This page is intentionally left blank 17 14 Airspan Networks Inc 01040311 07 ...