19.3.4. Task 3: Verify BSR Power Control is Enabled
The following procedure describes how to verify that BSR power management is
enabled.
To verify that BSR power management of SPRs' transmit power:
In the BSR Zoom window, from the MultiDevices menu, point to
RF
, and then
choose
Power Settings
.
Management
modes
enabled
("YES")
Figure
19-13: Verifying BSR power management is enabled
As can be seen in the figure above, the BSR power management is enabled, which
indicated by the following fields:
Per Power Mng Mode:
displays
YES
Power Mng Mode:
displays
YES
19-12
Airspan Networks Inc.
01040311-07
Содержание AS3010
Страница 4: ...This page is intentionally left blank ...
Страница 16: ...Contents Commissioning Manual This page is intentionally left blank xvi Airspan Networks Inc 01040311 07 ...
Страница 48: ...Installing ASWipLL Management Software Commissioning Manual 5 Click Next 2 4 Airspan Networks Inc 01040311 07 ...
Страница 318: ...Managing Bandwidth Commissioning Manual This page is intentionally left blank 11 10 Airspan Networks Inc 01040311 07 ...
Страница 330: ...Defining Virtual Ports Commissioning Manual This page is intentionally left blank 13 6 Airspan Networks Inc 01040311 07 ...
Страница 372: ...Defining Air Subnets Commissioning Manual This page is intentionally left blank 15 20 Airspan Networks Inc 01040311 07 ...
Страница 390: ...Defining PPPoE Commissioning Manual This page is intentionally left blank 17 14 Airspan Networks Inc 01040311 07 ...