![Agilent Technologies G7104A Скачать руководство пользователя страница 92](http://html1.mh-extra.com/html/agilent-technologies/g7104a/g7104a_user-manual_2867748092.webp)
92
Agilent 1290 Infinity II Flexible Pump User Manual
7
Maintenance
Replace the Inlet Valve
Replace the Inlet Valve
When
If Inlet valve is defective.
Tools required
p/n
Description
Wrench, 14 mm
G4220-20012
Torque wrench 2 – 25 Nm
Parts required
p/n
Description
G4204-60022
Inlet Valve 1290 Infinity Quaternary Pump
Preparations
•
Switch off pump at the main power switch
•
Open the doors
•
Use an optional solvent shutoff valve or lift up solvent filters inside solvent bottles for avoiding
leakages
•
Remove the inlet weaver, see
1
With a 14 mm wrench, unscrew the inlet valve and
remove it.
2
Install the new inlet valve and tighten it using a torque
wrench with a 14 mm bit set to 10 Nm.
Next Steps:
3
Insert the inlet weaver, see
4
Purge the system to remove air.
&
'
&
'
&%Cb
Содержание G7104A
Страница 1: ...Agilent Technologies Agilent 1290 Infinity II Flexible Pump User Manual...
Страница 8: ...8 Agilent 1290 Infinity II Flexible Pump User Manual Contents...
Страница 22: ...22 Agilent 1290 Infinity II Flexible Pump User Manual 1 Introduction Leak and Waste Handling...
Страница 32: ...32 Agilent 1290 Infinity II Flexible Pump User Manual 3 Using the Pump Magnets Magnets...
Страница 38: ...38 Agilent 1290 Infinity II Flexible Pump User Manual 3 Using the Pump Best Practices...
Страница 160: ...160 Agilent 1290 Infinity II Flexible Pump User Manual 8 Parts and Materials Tools...
Страница 218: ...218 Agilent 1290 Infinity II Flexible Pump User Manual 11 LAN Configuration PC and User Interface Software Setup Setup...