![Agilent Technologies G7104A Скачать руководство пользователя страница 100](http://html1.mh-extra.com/html/agilent-technologies/g7104a/g7104a_user-manual_2867748100.webp)
100
Agilent 1290 Infinity II Flexible Pump User Manual
7
Maintenance
Replace the Multi-Channel Gradient Valve (MCGV)
Replace the Multi-Channel Gradient Valve (MCGV)
Tools required
p/n
Description
0100-1710
Mounting Tool for Tubing Connections
8710-0899
Pozidriv screwdriver
Parts required
p/n
Description
G1311-67701
Multi channel gradient valve (MCGV)
Preparations
•
Switch off pump at the main power switch
•
Open the doors
•
Use an optional solvent shutoff valve or lift up solvent filters inside solvent bottles for avoiding
leakages
N O T E
For best performance and life time, use lower channels A and D for aqueous solvents in
buffer applications.
1
Use the mounting tool for removing tubing connections
between the degassing unit and the MCGV.
2
Remove the inlet weaver, see
3
Remove the cover from the MCGV.
Содержание G7104A
Страница 1: ...Agilent Technologies Agilent 1290 Infinity II Flexible Pump User Manual...
Страница 8: ...8 Agilent 1290 Infinity II Flexible Pump User Manual Contents...
Страница 22: ...22 Agilent 1290 Infinity II Flexible Pump User Manual 1 Introduction Leak and Waste Handling...
Страница 32: ...32 Agilent 1290 Infinity II Flexible Pump User Manual 3 Using the Pump Magnets Magnets...
Страница 38: ...38 Agilent 1290 Infinity II Flexible Pump User Manual 3 Using the Pump Best Practices...
Страница 160: ...160 Agilent 1290 Infinity II Flexible Pump User Manual 8 Parts and Materials Tools...
Страница 218: ...218 Agilent 1290 Infinity II Flexible Pump User Manual 11 LAN Configuration PC and User Interface Software Setup Setup...