![Agilent Technologies AssayMAP Bravo Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/agilent-technologies/assaymap-bravo/assaymap-bravo_installation-manual_2867689018.webp)
Installing the platform
Installing the 96AM Wash Station and Pump Module
10
AssayMAP Bravo Platform Installation Guide
Installing the 96AM Wash Station and Pump Module
The 96AM Wash Station fits on a platepad with brackets that hold the wash
station securely in place, as the following figure shows.
Figure
96AM Wash Station installed on platepad with brackets
Before you start
Use the following workflow.
Step
For this task...
See...
1
Ensure that the wash station
chimneys are in good
condition.
“Wash station inspection” on
page 11
2
Install the bracketed platepad
and the 96AM Wash Station at
deck location 1.
“Installing the 96AM Wash Station
and Pump Module” on page 10
3
Set up the tubing
configuration.
“Tubing connections for 96AM
Wash Station” on page 14
4
Connect the tubing and the
Pump Module power and
communication cables.
Содержание AssayMAP Bravo
Страница 1: ...AssayMAP Bravo Platform Installation Guide Original Instructions...
Страница 86: ...Setting the teachpoints Checking and adjusting the gripper offset 78 AssayMAP Bravo Platform Installation Guide...
Страница 113: ......
Страница 114: ...Agilent Technologies Installation Guide G5571 90001 Revision B March 2018...