![Agilent Technologies AssayMAP Bravo Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/agilent-technologies/assaymap-bravo/assaymap-bravo_installation-manual_2867689020.webp)
Installing the platform
Installing the 96AM Wash Station and Pump Module
12
AssayMAP Bravo Platform Installation Guide
Installing the 96AM Wash Station
Before you start
Ensure that you have the following:
•
96AM Wash Station and the platepad with brackets
•
Pump Module 2.0
•
Tubing kit with inline filter
•
Hex driver for 2- mm screws
Ensure that you install the 96AM Wash Station at deck location 1.
Figure
96AM Wash Station installed at deck location 1
To install the wash station:
1
At deck location 1, remove the standard platepad, if installed, and then
install the bracketed platepad. Use the supplied screw to secure the
platepad to the deck.
Ensure the platepad crosshairs are oriented towards the northwest corner
of the deck, as the following figure shows.
WARNING
To prevent potential injury, turn off the Bravo Platform before you install or
remove any accessory.
Содержание AssayMAP Bravo
Страница 1: ...AssayMAP Bravo Platform Installation Guide Original Instructions...
Страница 86: ...Setting the teachpoints Checking and adjusting the gripper offset 78 AssayMAP Bravo Platform Installation Guide...
Страница 113: ......
Страница 114: ...Agilent Technologies Installation Guide G5571 90001 Revision B March 2018...