![Agilent Technologies AssayMAP Bravo Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/agilent-technologies/assaymap-bravo/assaymap-bravo_installation-manual_2867689023.webp)
15
Installing the platform
Installing the 96AM Wash Station and Pump Module
AssayMAP Bravo Platform Installation Guide
Figure
Tubing configuration
2
5
4
6
3
4
3
4
5
7
8
8
6
1
4
4
4
6
6
Item
Component
Description
1
Source bottle
Supplies the fill liquid for the wash station.
2
Waste bottle
Collects the waste liquid that is pumped from the reservoir.
3
Tubing, 8- mm
(5/16- in)
The length of tubing in the lower pump head, which is used for emptying
the wash station. The larger diameter tubing ensures that the fluid is
removed efficiently from the wash station
4
Tubing, 6.4- mm
(1/4- in)
The fill- line tubing from the source bottle to the wash station, and
empty- line tubing connections on either side of the 5/16- in diameter
tubing.
Note:
The 5/16- in diameter tubing is too large for the quick- disconnect
fittings and the wash station ports. So, you use a union connector (
5
) to
splice the 5/16- in tubing to the 1/4- in tubing.
5
Connector,
union
Joins the two sizes of tubing.
6
Quick-
disconnect
fitting
Enables easy removal of the wash station and quick replacement of the
tubing in the pump heads. The quick- disconnect fittings include an
automatic- close valve. Fluid can flow only if a positive connection is
made.
7
Inline pump
filter
Removes the particulates that can clog the chimneys in the wash station.
8
3- way
connector
Enables one tube to branch into two tubes at the input and output ports
on the wash station.
Содержание AssayMAP Bravo
Страница 1: ...AssayMAP Bravo Platform Installation Guide Original Instructions...
Страница 86: ...Setting the teachpoints Checking and adjusting the gripper offset 78 AssayMAP Bravo Platform Installation Guide...
Страница 113: ......
Страница 114: ...Agilent Technologies Installation Guide G5571 90001 Revision B March 2018...