![Agilent Technologies AssayMAP Bravo Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/agilent-technologies/assaymap-bravo/assaymap-bravo_installation-manual_2867689034.webp)
Installing the platform
Installing and connecting the Orbital Shaking Station
26
AssayMAP Bravo Platform Installation Guide
Connecting the STC controller
The following figure shows the Inheco STC Controller.
Figure
STC Controller front and rear views
For details on the STC Controller, see the Inheco user documentation.
To connect the STC Controller:
1
Connect the STC Controller to the computer using the provided USB cable.
2
Connect the STC Controller power cable to an AC outlet.
3
Set the controller power switch to the
On
(
|
) position.
Installing and connecting the Orbital Shaking Station
The following figure shows the Orbital Shaking Station, which has its own
control module.
Figure
Orbital Shaking Station with control module and adapter pad
USB
ID
ext.
Sensor
C
CP
CP
CP
CP
P
A
AC
AC
AC
AC
AC
C
2
2
21
21
21
21
21
5
5
5
.5
.5
5
5
°
°C
°C
°C
°C
C
1
10
10
10
10
0
0
0
00
00
00
00
rp
rp
rp
rp
rp
rp
p
m
m
m
m
m
Содержание AssayMAP Bravo
Страница 1: ...AssayMAP Bravo Platform Installation Guide Original Instructions...
Страница 86: ...Setting the teachpoints Checking and adjusting the gripper offset 78 AssayMAP Bravo Platform Installation Guide...
Страница 113: ......
Страница 114: ...Agilent Technologies Installation Guide G5571 90001 Revision B March 2018...