
Using
Detector
Calibration
Detector
calibration
is
useful
for
c
haracterizing
and
comp ensating
for
negative
dio
de
detectors
used
in
external
lev
eling.
Detectors
may
b e
c
haracterized
b
y
three
op erating
regions
as
sho
wn
in
Figure
1-12:
the
square
law,
the
linear,
and
the
transition
region.
The
following
steps
use
an
HP/Agilent
437B
to
automatically
c
haracterize
the
op erating
regions
and
use
this
information
to
automatically
comp ensate
for
the
detector
b eing
used.
The
equipmen
t
setup
sho
wn
in
Figure
1-22
assumes
that
the
steps
necessary
to
correctly
externally
lev
el
ha
v
e
b een
follow
ed.
Refer
to
men
u
map
9,
USER
CAL.
Figure
1-22.
Automatically
Characterizing
and
Compensating
for
a
Detector
1.
Connect
the
p o
w
er
meter
as
sho
wn.
2.
Zero
and
calibrate
the
p o
w
er
meter/sensor.
3.
En
ter
the
appropriate
p o
w
er
sensor
calibration
factors
in
to
the
p o
w
er
meter.
4.
Enable
the
p o
w
er
meter/sensor
cal
factor
array
.
F
or
op erating
information
on
the
HP/Agilent
437B
p o
w
er
meter,
refer
to
its
op erating
and
service
man
ual.
5.
Connect
the
p o
w
er
sensor
to
the
output
of
the
coupler
(or
splitter).
6.
On
the
sw
ept
signal
generator,
set
the
p o
w
er
lev
el
and
start/stop
frequency
information
as
desired.
7.
Press
4
USER
CAL
5.
8.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Ext
Det
Cal
.
The
p o
w
er
meter
is
no
w
under
sw
ept
signal
generator
con
trol
and
is
p erforming
the
sequence
of
steps
necessary
to
generate
the
comp ensation
information.
Getting
Started
Adv
anced
1-47
Содержание 8360B
Страница 10: ...Declaration of Conformity x ...
Страница 53: ...Figure 1 12 Typical Diode Detector Response at 25 C Getting Started Advanced 1 25 ...
Страница 136: ...Figure 1 34 Typical Status Register Bit Changes 1 108 Getting Started Programming ...
Страница 141: ...Figure 1 38 Inside an Event Detection State Getting Started Programming 1 113 ...
Страница 154: ...4ALC5 Figure A 1 ALC System Simplified Block Diagram Operating and Programming Reference A 5 ...
Страница 363: ...SCPI STATUS REGISTER STRUCTURE S 56 Operating and Programming Reference ...
Страница 364: ...SCPI STATUS REGISTER STRUCTURE Operating and Programming Reference S 57 ...
Страница 406: ...2b Menu Maps Menu Maps 2b 1 ...
Страница 407: ......
Страница 408: ......
Страница 409: ......
Страница 410: ......
Страница 411: ......
Страница 412: ......
Страница 413: ......
Страница 414: ......
Страница 415: ......
Страница 438: ...Figure 3 1 AC Power Cables Available Installation 3 5 ...
Страница 469: ...5 Instrument History This chapter is left blank until this manual requires changes Instrument History 5 1 ...