VISTA-128B PLUS Installation and Setup Guide
3-24
+
WEEKLY TESTING IS REQUIRED
TO ENSURE PROPER OPERATION
OF THIS SYSTEM.
POLE Door Strike/Mag Coil
DATA 1 (WHITE)
DATA 0 (GREEN)
NOTE 1: USE UL LISTED ENERGY CABLE FOR ALL CONNECTIONS.
NOTE 2: VISTAKEY TB3 TERMINAL 5 IS A GROUND AND MAY BE
USED INSTEAD OF TB3 TERMINAL 2. TB3 TERMINALS 2 AND 5 ARE
A COMMON GROUND.
NOTE 3: WHEN USING TRIGGER TO TURN ON AN LED OR BUZZER,
RETURN HIGH SIDE OF LED OR BUZZER TO TB3 TERMINAL 7.
TRIGGER RATING IS 15mA AT 12VDC.
+5V
GND
TRIGGER (SEE NOTE 3)
+12V (RED)
ZONE C (General)
ZONE A (DSM)
ZONE B (RTE)
POLLING LOOP -
14V MAX (12V @ 85-160mA Nominal)
POLLING LOOP +
GND
GND
GND
N/O DOOR STRIKE POWER
N/C MAG COIL POWER
2
3
4
5
6
7
8
11 12
2 3 4 5 6 7 8 9 10
1
RELAY CONTACT RATINGS:
3A @ 28VDC MAX. (RESISTIVE LOAD)
TB 1
TB 3
1
READER INTERFACE CABLE
GND (BLACK)
RDR LED (ORANGE)
TO ALARM SYSTEM
CONTROL PANEL
POLLING LOOP TERMINALS.
NO
CONNECTION
VISTAKEY
THIS DEVICE COMPLIES WITH PART 15 CLASS A
LIMITS OF FCC RULES. OPERATION IS SUBJECT
TO THE FOLLOWING TWO CONDITIONS:
(1) IT MAY NOT CAUSE HARMFUL INTERFERENCE.
(2) IT MUST ACCEPT ANY INTERFERENCE THAT
MAY CAUSE UNDESIRED OPERATION.
K1
DOOR
CONTROL
RELAY
FOR ADDITIONAL RATINGS AND
SPECIFICATIONS, REFER TO
INSTALLATION INSTRUCTION
FOR THE VISTAKEY-SK.
THIS EQUIPMENT SHOULD BE INSTALLED IN
ACCORDANCE WITH THE NATIONAL FIRE
PROTECTION ASSOCIATION'S STANDARDS 70 &
74 (NATIONAL FIRE PROTECTION ASSOC.,
BATTERYMARCH PARK, QUINCY, MA. 02269).
PRINTED INFORMATION DESCRIBING PROPER
MAINTENANCE, EVACUATION PLANNING AND
REPAIR SERVICE IS TO BE PROVIDED WITH
THIS EQUIPMENT.
TO TB1, 11 OR 12
+ 12 VDC TO ONLY
ONE OF THESE INPUTS.
(FROM TB1-1)
Figure 3-31: Wiring the VistaKey
Connecting the Card Reader
Lead from Reader
Lead Color
To VistaKey TB3
Terminal #
Green LED
Orange
1
Ground* Black 2
DATA 1 (Clock)
White
3
DATA 0 (Data)
Green
4
+5VDC† Red† 6
+12VDC† Red† 7
* TB-3 Terminal 5 is also a ground and may be used
instead of terminal 2. Terminals 2 and 5 are a common
ground.
† Connect to +5VDC OR +12VDC per reader
manufacturer’s specification.
Access Control Using the PassPoint Access Control System
The VISTA-128B PLUS interfaces with the PassPoint
ACS via the VISTA Gateway Module (VGM). The VGM
is connected between the ECP bus (keypad terminals)
of the control and the network bus of the PassPoint
ACS.
The control sends the VGM its status information,
event log entries, and entry/exit requests (inputs
programmed with response type Access Point) from
keypads, hardwired zones, and RF transmitters. The
VGM then reformats and retransmits this information
to the Main Logic Board, (MLB) on the PassPoint ACS
network bus.
UL
Interfacing the VISTA-128B PLUS with the
PassPoint Access Control System via the VISTA
Gateway Module is not permissible for UL
installations.
Wiring the VISTA Gateway Module
The VISTA Gateway Module is connected between the
ECP bus (VISTA-128B PLUS keypad terminals) and
the network bus of the PassPoint Access Control
System. See Figure 3-32 for the proper wiring
connections.
Содержание Vista-128B PLUS
Страница 2: ......
Страница 8: ...viii...
Страница 100: ...VISTA 128B PLUS Installation and Setup Guide 6 18...
Страница 106: ...VISTA 128B PLUS Installation and Setup Guide 8 2...
Страница 112: ...VISTA 128B PLUS Installation and Setup Guide 9 6...
Страница 124: ...VISTA 128B PLUS Installation and Setup Guide C 2...
Страница 128: ...VISTA 128B PLUS Installation and Setup Guide D 4...
Страница 138: ...l K4968 11 00 165 Eileen Way Syosset New York 11791 Copyright 2000 PITTWAY CORPORATION...