
14
FRAMING
Attach the two stand-off assembles to the top of the unit using four
10-32 X 1/2 screws as shown.
INSTALLATION
The top stand-offs provide the minimum clearance to the header. Use only non-combustible material in this area for the entire
width of the appliance. DO NOT use wood, sheet-rock, etcetera, in this zone. Top stand-off brackets must be formed and
attached prior to positioning into framed opening.
The two stand offs are located in the firebox. The four 10-
32 X 1/2 screws are provided in the parts bag.
Wall Enclosure Rough Opening
• Framing dimensions should allow for wall
covering thickness and fireplace facing
materials. If using a hearth, adjust the rough
opening size as necessary to maintain
minimum clearance requirements.
• If masonry is to be used (optional), prepare
the necessary foundation for the masonry
load. When masonry construction is to be
used, a lintel must be used over the top
of the fireplace to support the additional
weight.
Provide adequate clearances around air openings into the combustion chamber. Provide adequate clearance in front of
the appliance for barrier removal, component access, gas line installation, service access, etc.
15-7/8”
(403 mm)
47-1/4” (1201 mm)
36-1/4”
(920 mm)
Содержание AH3024FP
Страница 46: ...46 NOTES...
Страница 47: ...47 NOTES...