
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
89
of
131
5.14.
Cable connections of the Dual Depot Charge Box
DANGER
Make sure that the main switch of the power supply group for the product
is set to the
OFF
position.
Do a voltage check
to make sure that the
electrical power is disconnected from the system. Secure against
resetting.
5.14.1.
Gland layout of the Dual Depot Charge Box
Gland layout at the Dual Depot Charge Box’s bottom
Gland #
Clamping range ØF
Cable
00
9-16 mm
Spare
01
5-10 mm
Interlock Out
02
5-10 mm
AC In
03
5-10 mm
Interlock In
04
5-10 mm
AC Out
05
22-32 mm
DC+ In
06
22-32 mm
DC+ Out
07
22-32 mm
DC- In
08
22-32 mm
DC- Out
09
3x7 mm
Ext. EMO, Ext. Beacon 1, Ext. Stop button 1
10
3x7 mm
Ext. EMO, Ext. Beacon 2, Ext. Stop button 2
11
10-14 mm
PE
12
10-14 mm
PE
13
18-25 mm
Spare
14
18-25 mm
Spare
15
9-16 mm
Ethernet In
16
9-16 mm
Ethernet Out
Description of glands’ functions and clamping ranges
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...