
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
51
of
131
Important: all cables must be resistant to being placed in the ground, inside a conduit.
All cables must have an isolation that is self-extinguishing and flame retardant
according to DIN VDE 0482-332-1-2, DIN EN 60332-1-2, IEC 60332-1-2.
All cables must correspond to the VDE, CE and EAC Low Voltage Directive and must
meet the RoHS compliance.
The identity and/or function of the cable must be marked every 2000 mm of the cable’s
length and on its both ends.
4.5. Internet connection
In most cases the integrated 3G modem is used for wireless internet access. A customer SIM
card is not required. If there is no 3G signal available, a standard wired internet connection is
required. For this option, contact ABB Sales department (see
Contact information
on Page 12
for contact details).
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...