
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
52
of
131
5.
Placement and Connection
5.1. About placement and connection
When the construction phase is finished, the HVC-R 100/150 E-Bus Charger can be placed
and connected.
The planning steps for the placement and connection phase are shown in the figure below.
Usually, the procedure can be done within one day.
Indication of Placement and Connection phase on the planning diagram
C1
Routing the cables
on Page 53.
C2
Unpacking Power Cabinet
on Page 54.
C3
Moving the Power Cabinet
on Page 56 and
Installing the Power Cabinet onto a
foundation
on Page 59.
C4
Connecting AC power cables and PE wires to the Power Cabinet
on Page 67,
Connecting the Power Cabinet’s DC power cables
on Page 73 and
Connecting the
communication cable to the Power Cabinet
on Page 78.
C5
Unpacking the Dual Depot Charge Box
on Page 81.
C6
Installing the Dual Depot Charge Box onto a
on Page 82 or
Mounting the Dual Depot
Charge Box onto a wall
on Page 86.
C7
Cable connections of the Dual Depot Charge Box
on Page 89.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...