
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
36
of
131
3.10.
Lightning protection
One electrode (ground rod) of maximum 10
Ω
must be placed in to the earth near the
foundation of the Power Cabinet. In some cases, additional grounding is required at the Dual
Depot Charge Box’s side. This depends on the local regulations and should be determined by
the Contractor.
If the grid is TT based, consult the grid Owner. It is possible that an extra 0,9
Ω
electrode will
be required. This requirement must be determined by the Contractor.
Consult a local specialist for the options of lightning protection. The charge system has to be
within the protection angle of the lightning distraction. This requirement must be determined
by the Owner and a local specialist (according to NEN-EN-IEC 62305).
The implementation of the lightning protection depends on the local laws, safety and electrical
regulations. This requirement must be determined by the Contractor and Owner of the site /
HVC-R 100/150 E-Bus Charger.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...