
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
71
of
131
WARNING
Leave the main switch OFF.
The Power Cabinet is
not
ready to use yet.
If there is no appointment for commissioning yet, contact the ABB
Delivery department to make an appointment for commissioning. See
Contact information
on Page 12 for contact details.
5.6.5. Installing lightning protection (optional)
Prerequisites:
Tools: wire cutter, wire stripper pliers, wire-end ring, spanner (size 19), torque wrench
(size 19).
Method of connecting the lightning protection wire
1. Cut the wire of the lightning protection cable to the proper length to reach the PE rail. Do
not make the wire routing neither too tight nor too loose.
2. Strip 20 mm of the insulation from the end of the wire.
3. Attach a wire end ring (A) to the end of the lightning protection wire (B).
4. Remove the M12 bolt, nut and washers from the PE rail.
5. Fit the bolt (C) with toothed washer (D), the lightning protection wire (B) and the contact
washer (E).
6. Insert the bolt fitted with washers and the lightning protection wire into the PE rail.
7. Screw from the bottom of the PE rail a toothed washer (D) and a nut (F) on the bolt (C)
8. Tighten the bolt/nut connection with a tightening torque of 30 Nm.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...