
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
61
of
131
5. Tighten the bolts with a tightening torque of 200 Nm.
Removing swivel eye bolts
6. Remove the swivel eye bolts or lifting loops (A).
7. Place the cover caps (B) in the holes (4x).
5.5.2. Opening the door of the Power Cabinet
Prerequisites:
The key previously removed from the Power Cabinet (bag containing parts).
Opening the Power Cabinet’s door
1. Unlock the handle (B)
2. Use the handle (B) to open the door (A).
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...