Next steps are only applicable if the Dual Depot Charge Box is to be installed on a pedestal.
6. Unpack the pedestal.
7. Remove the cover of the wooden box.
8. Lift the pedestal out of the box.
9. Place the pedestal on a
secure surface
with its top facing up.
CAUTION
To prevent damage to the paint layer of the pedestal, always place the
pedestal on a secure surface that provides sufficient protection against
scratches and other damage.
ABB is not responsible for any damage caused to the pedestal during its
unpacking.
10. Remove all protective foam from the pedestal.
5.12.
Installing the Dual Depot Charge Box onto a Pedestal
5.12.1.
Connecting the Pedestal to the Foundation
Prerequisites:
All packaging material is removed from the Pedestal.
A minimum of two people is required.
Tools: torx screwdriver (size T30), spanner (size 19).
1. Remove the front cover plate (A) from the Pedestal (B) by loosening the bolts (C) (8x).
2. Put the front cover plate (A) and the bolts (C) in a safe location as they will be installed
back later on.
Removing the pedestal’s front cover plate.
3. Remove the rear cover plate (H) from the Pedestal (B) by loosening the bolts (G) (6x).
4. Put the rear cover plate (H) and the bolts (G) in a safe location as they will be installed
back later on.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...