
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
44
of
131
6.
IMPORTANT
: Place the foundation (A) in the correct position. Mind the desired
location of the Dual Depot Charge Box’s door.
7. Make sure that the front top surface of the foundation is at least 15 mm above ground
level (see figure above).
8. Make sure that the top surface of the foundation is leveled.
9. Route the conduits through the foundation’s holes (B).
10. Fill the space surrounding the foundation in the ground and the channels for the
conduits with filling material (e.g. sand). Filling material should be packed 2 – 3 times
with a packing machine until the desired ground level is obtained. Avoid having filling
material enter the foundation’s interior.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...