
HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
69
of
131
5.6.3. Connecting the AC power cables
Prerequisites:
Tools: wire cutter, wire stripper pliers, spanner (size 19), torque wrench (size 19).
DANGER
Make sure that the main switch of the power supply group for the product
is set to the
OFF
position.
Do a voltage check
to make sure that the
electrical power is disconnected from the system. Secure against
resetting.
Method of connecting the AC power cables
1. Cut the wires of the AC power cable to the proper lengths to reach the connectors. Do not
make the wire routing neither too tight nor too loose.
2. Strip 20 mm of the insulation from the ends of the wires (B).
3. Attach wire end rings (A) at the end of the wires.
4. Remove the nuts and washers (C) from the bolts (M12) of connector block (D).
5. Insert the 3 wires (B) with the nuts and washers onto the bolts of connector block (D).
• From left to right:
L1 (brown),
L2 (black),
L3 (grey or black).
6. Tighten the nuts (C) with a tightening torque of 30 Nm.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...