NOTICE
It can take a long time to get the necessary permits and to upgrade the
electrical grid. Make sure the plan includes the possible occurrence of
resulting delays.
3.3. Required permits
The installation of an HVC-R 100/150 E-Bus Charger will require a number of permits,
depending on national and local laws. This section lists a number of points of attention.
3.3.1. Power connection
The HVC Power Cabinet requires high current (400 V AC 238 A for 150 kW) connections. A
domestic or small business power connection will not be sufficient. For each Dual Depot
Charge Box a standard one phase AC connection (L-N + PE) is required.
Measure, check and report the position of the cables connecting the power distribution board
and the Power Cabinet, and the cables connecting the Power Cabinet and the ACS Control
Module.
Contact your electricity Retailer and/or Grid Owner if a grid upgrade is required. Ask about the
work that is needed to upgrade the connection to meet the requirements described in section
Electrical installation
on Page 33.
3.3.2. Construction permit
The installation of the HVC-R 100/150 E-Bus Charger requires performing the following
actions in regard to construction works:
Obtaining the necessary work permits.
Construction of a solid base.
Placing cable conduits for cable connections between the power distribution board and
the Power Cabinet. Usually, these cable conduits are installed below ground.
Placing cable conduits for cable connections between the Power Cabinet and the ACS
Control Module.
Designation of parking spaces for the buses to be charged.
Placing information signs, on the road or on its side, in order to position the buses in
the desired manner.
Contact your local government representatives to obtain information about the necessary
permits.
Содержание HVC-R 100
Страница 1: ... INSTALLATION GUIDE HVC R 100 150 E Bus Charger Installation Guide for EU products Version 0 4 ...
Страница 122: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 122 of 131 ...
Страница 125: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 125 of 131 ...
Страница 131: ...HVC R 100 150 E Bus Charger Installation Guide Document v0 4 Document No TBA Date 11 08 2021 Page 131 of 131 NOTES ...