Start-up 73
9. Save the valid parameter values to permanent memory by
setting parameter
96.07 Parameter save manually
to Save.
10. Validate the settings made in parameter groups 51, 52 and 53
by setting parameter
51.27 FBA A par refresh
to Configure.
11. Configure control locations EXT1 and EXT2 to allow control
and reference signals to come from the fieldbus.parameter
changes, or after changing the fieldbus module.
Содержание FPBA-01 PROFIBUS DP
Страница 1: ...Options for ABB drives converters and inverters User s manual FPBA 01 PROFIBUS DP adapter module ...
Страница 4: ......
Страница 10: ...10 Table of contents Document library on the Internet 195 ...
Страница 20: ...20 About the manual ...
Страница 26: ...26 Overview of the PROFIBUS network and the FPBA 01 module ...
Страница 30: ...30 Mechanical installation ...
Страница 91: ...Start up 91 8 Click Properties Network Settings and set baud rate ...
Страница 98: ...98 Start up ...
Страница 118: ...118 Communication profiles ...
Страница 178: ...178 Diagnostics ...
Страница 182: ...182 Technical data ...
Страница 190: ...190 Appendix A PROFIdrive parameters ...