52 Start-up
Starting up ACS355 drives
1. Power up the drive.
2. Enable the communication between the adapter module and
the drive by setting parameter
9802 COMM PROT SEL
to EXT
FBA.
3. Set the FPBA-01 configuration parameters in group 51. At the
minimum, set the required node address in parameter
5102
and the communication profile in
5105
.
4. With parameter
3018 COMM FAULT FUNC
, select how the
drive reacts to a fieldbus communication break.
5. With parameter
3019 COMM FAULT TIME
, define the time
between communication break detection and the selected
action.
6. Define the process data transferred to and from the drive in the
FPBA-01 configuration parameter groups 54 and 55.
Note:
The adapter module sets the Status word and actual
value automatically in parameters
5401
and
5402
, and Control
word and reference in parameters
5501
and
5502
.
7. Validate the settings made in parameter groups 51, 54 and 55
by setting parameter
5127 FBA PAR REFRESH
to REFRESH.
8. Set the relevant drive control parameters to control the drive
according to the application. Examples of appropriate values
are shown in the tables below.
Содержание FPBA-01 PROFIBUS DP
Страница 1: ...Options for ABB drives converters and inverters User s manual FPBA 01 PROFIBUS DP adapter module ...
Страница 4: ......
Страница 10: ...10 Table of contents Document library on the Internet 195 ...
Страница 20: ...20 About the manual ...
Страница 26: ...26 Overview of the PROFIBUS network and the FPBA 01 module ...
Страница 30: ...30 Mechanical installation ...
Страница 91: ...Start up 91 8 Click Properties Network Settings and set baud rate ...
Страница 98: ...98 Start up ...
Страница 118: ...118 Communication profiles ...
Страница 178: ...178 Diagnostics ...
Страница 182: ...182 Technical data ...
Страница 190: ...190 Appendix A PROFIdrive parameters ...