![ABB DressPack IRB 6640 Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/abb/dresspack-irb-6640/dresspack-irb-6640_product-manual_5004062.webp)
Note
Action
Fit the
process cable support, axis
6 complete
by performing the fol-
lowing steps:
•
Remove the lower half of the
process cable support axis
6 (
clamp
), by removing its
attachment screws.
•
Fit the parts from "behind"
the robot turning disk.
•
Make sure the process
cable support is turned the
right way!
•
Pull the assembly forwards
until it is seated against the
rear of the turning disk.
Note
Lock the
M10x40 screws
with
locking liquid
.
Do not use locking liquid on the
M12x80 screws
!
Tightening torque M12x80 screws:
70 Nm
4
Note
Make sure there are equal gaps
between clamp and support of the
process cable support axis 6.
62
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
2 Installation
2.2.4 Fitting the attachments of IRBDP MH2 UE and IRBDP SW2 UE
Continued
Содержание DressPack IRB 6640
Страница 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 220: ...This page is intentionally left blank ...
Страница 324: ...This page is intentionally left blank ...
Страница 338: ...This page is intentionally left blank ...
Страница 364: ...This page is intentionally left blank ...
Страница 366: ...This page is intentionally left blank ...
Страница 369: ......