![ABB DressPack IRB 6640 Скачать руководство пользователя страница 286](http://html.mh-extra.com/html/abb/dresspack-irb-6640/dresspack-irb-6640_product-manual_5004286.webp)
Note
Action
xx1200000110
Fit the
clamp jaw
.
8
Lift the cable package up and put the
clamp
jaw
in the ball joint housing.
9
xx1200000061
Fit the upper part of the
ball joint housing
.
10
Refitting step 2 - Hose reinforcement funnel
Use this procedure to fit the hose reinforcement funnel.
Note
Action
A
xx0300000061
Cut the new protection hose (for the front
end) to the length required.
Note
Place the cut on top of a ridge. See A in the
figure!
1
Front end: 1,500 mm
Continues on next page
286
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
4 Repair
4.2.12 Replacing the protection hose - IRBDP SW6 UI and MH6 UI - Upper arm
Continued
Содержание DressPack IRB 6640
Страница 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Страница 2: ...Trace back information Workspace R18 1 version a9 Checked in 2018 03 22 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 194: ...This page is intentionally left blank ...
Страница 220: ...This page is intentionally left blank ...
Страница 324: ...This page is intentionally left blank ...
Страница 338: ...This page is intentionally left blank ...
Страница 364: ...This page is intentionally left blank ...
Страница 366: ...This page is intentionally left blank ...
Страница 369: ......