Start-up, control with I/O and ID Run
52
After completing a set-up task, the Start-up Assistant suggests the
next one.
• Press
(when
is highlighted) to continue with the
suggested task.
• Press key
to highlight
and then press
to move to
the following task without doing the suggested task.
• Press
to stop the Start-up Assistant.
SAVING A USER MACRO AND FINAL CHECK
The start-up is now completed. However, it might be useful at this
stage to set the parameters required by your application and save
the settings as a user macro as instructed in section
on page
.
After the whole set-up is completed, check there are no faults or
alarms shown on the display and the panel LED is green and does
not blink.
The drive is now ready for use.
OK
Continue
Skip
OK
EXIT
Do you want to
continue with
application setup?
Continue
Skip
EXIT
OK
00:00
CHOICE
REM
Содержание ACS350 Series
Страница 1: ...ACS350 User s Manual ACS350 Drives 0 37 22 kW 0 5 30 HP ...
Страница 4: ......
Страница 8: ...Safety 8 ...
Страница 18: ...Table of contents 18 ...
Страница 24: ...Hardware description 24 ...
Страница 44: ...Installation checklist 44 ...
Страница 56: ...Start up control with I O and ID Run 56 ...
Страница 140: ...Program features 140 ...
Страница 242: ...Actual signals and parameters 242 ...
Страница 266: ...Fieldbus control with embedded fieldbus 266 ...
Страница 284: ...Fault tracing 284 ...
Страница 288: ...Maintenance and hardware diagnostics 288 ...
Страница 309: ...Dimensions 309 Frame size R2 IP20 NEMA 1 3AFE68586658 A Frame size R2 IP20 NEMA 1 VAR EMC ...
Страница 311: ...Dimensions 311 Frame size R3 IP20 NEMA 1 3AFE68579872 B Frame size R3 IP20 NEMA 1 VAR EMC ...
Страница 312: ...Dimensions 312 Frame size R4 IP20 cabinet installation UL open Frame size R4 cabinet installation UL open 3AFE68935644 ...
Страница 313: ......