39
Non-Compressorized Liquid and Suction
Line Piping
There are two different locations to pipe out
of the unit, the post corner hole
location and
the post back hole location. The post corner
hole location is to run pipe along the roof and
then down by the disconnect switch
(Figure 20 and Figure 22). The post back hole
location is to run the pipe along the roof, back
across the coil, and come out near the blower
access panel (Figure 21 and Figure 23).
When drilling the holes, use a 3.2 cm (1 ¼”)
inch hole for the suction line and a 1 inch hole
for the liquid line (Figure 20 and Figure 21).
For pipe sizing, refer to appropriate
guidelines in the condenser or condensing
unit installation manual. The grommets will
help seal in between the holes in the sheet
metal and the piping. If you are piping
through the back post foam panel, attach
grommet to the inside skin of the foam part.
If you are piping through post corner hole
location, use caution around electrical wires.
You will need to turn off power to the unit.
Figure 21 - Post Corner Hole Location
Figure 22 - Post Back Hole Location
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...