30
Seismic Curb Installation
Using a standard curb with a seismic unit will
void the certification of the unit. All
mounting details listed must be followed to
achieve seismic certification. The AAON
unit must be certified to ICC-ES AC156
when using a seismic curb for seismic
certifications to apply. Any deviations or
modifications to the unit or curb will void all
seismic certification.
Structural engineer of record must approve
building anchorage to unit or curb in
compliance with OSP-0180-10. Use provided
self tapping screws to attach base of unit to
seismic curb bracket.
Figure 9 - Solid Bottom Seismic Curb with Filters
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...