![AAON RQ NextGen Series Скачать руководство пользователя страница 68](http://html2.mh-extra.com/html/aaon/rq-nextgen-series/rq-nextgen-series_installation-operation-and-maintenance_5032934068.webp)
68
Piping systems must not exceed 3.1 m/s
(10 ft/sec) fluid velocity to ensure tube wall
integrity and reduce noise.
Energy Recovery Units
General Information
AAONAIRE
®
units have been equipped with
an energy recovery wheel. This section is
provided to assure the energy recovery
feature will be properly setup to perform in
accordance with the job specifications for
your particular application.
1.
Removable Segment (NA for
monolith)
2.
Permanent Tension Belt
3.
Pulley
4.
Embedded Segment Stiffeners (NA
for monolith)
5.
Segment Retaining Latches (NA for
monolith)
6.
Bearing Beam and Bearing Access
Cover Plate (Diameter Seals are
behind Bearing Beam on both sides)
7.
Adjustable Purge
8.
Motor
Energy Recovery Wheel
The Energy Recovery Cassette consists of a
frame wheel, wheel drive system, and energy
transfer segments. Segments are removable
for cleaning or replacement. The segments
rotate through counter flowing exhaust and
outdoor air supply streams where they
transfer heat and/or water vapor from the
warm, moist air stream to the cooler and/or
drier air stream.
The initial setup and servicing of the energy
recovery wheel is very important to maintain
proper operation efficiency and building
occupant comfort.
Normal maintenance requires periodic
inspection of filters, the cassette wheel, drive
belts, air seals, wheel drive motor, and its
electrical connections.
Improper installation, adjustment,
alteration, service or maintenance can
cause property damage, personal
injury or loss of life. Startup and
service must be performed by a
Factory Trained Service Technician.
WARNING
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...