![AAON RQ NextGen Series Скачать руководство пользователя страница 29](http://html2.mh-extra.com/html/aaon/rq-nextgen-series/rq-nextgen-series_installation-operation-and-maintenance_5032934029.webp)
29
Vertical Duct Connection
Note:
If outside air will be in contact with the
air tunnel base the unit must include the base
insulation option or the base must be field
insulated.
Figure 8 - Vertical Duct Connection
Do not drill or punch holes in the base
of the unit, from inside the unit or from
below the unit to attach ductwork.
Leaking may occur if unit base is
punctured.
CAUTION
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...