103
Water/Glycol System
1.
Has the entire system been flushed and pressure checked?
Yes No
2.
Has the entire system been filled with fluid?
Yes No
3.
Has air been bled from the heat exchangers and piping?
Yes No
4.
Is the glycol the proper type and concentration (N/A if water)?
Yes No
5.
Is there a minimum load of 50% of the design load?
Yes No
6.
Has the water piping been insulated?
Yes No
7.
What is the freeze point of the glycol (N/A if water)?
______________________________
Gas Heating
Natural Gas
Propane
Purge Air from Lines
Verify Pilot Spark
Stage
Manifold Pressure (w.c.) inlet
Manifold Pressure (w.c.) outlet
1
2
3
4
Electric Heating
Stages__________
Limit Lockout
Aux. Limit Lockout
Stage
Amps
Stage
Amps
1
3
2
4
Electric Preheating
Limit Lockout
Aux. Limit Lockout
Outside Air Temperature Setpoint ________
°
C/°F
Preheat Leaving Air Temperature Setpoint ________
°C/
°F
Stage
Amps
Stage
Amps
1
3
2
4
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...