21
RQ Series Unified Feature String Nomenclature
GE
N
M
JR
EV
SIZ
E
SE
RIE
S
M
NR
EV
VL
T
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
1 2
3A
3B
3C
3D
3E
4A
4B
4C
5A
5B
5C
5D
5E
6A
6B
6C
6D
6E
7 8
9A
9B
9C
9D
RQ A - 030 - C - 0 - 3 - C A B 0 A
-
0 0 0 0 0 : 0 1 - 0 A G 0 K - E 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - C A - 0 0 0 0
- 0 0
-
0 0 - 0 - 0 0 0 - 0 0 - B A 0 B - 0 0 - 0 0 0 - A 0 0 0 0 0 - C 0 0 0 0 0 - 0 0 0 0 0
0 B
10A
10B
11A
11B
12
13A
13B
13C
14
15
16A
16B
16C
16D
17A
17B
18A
18B
18C
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
36: CABINET MATERIAL
0 = Galvanized Cabinet - Double Wall + R-13 Foam
Insulation
37: SPECIALS & PAINT
B = Premium AAON Gray Paint Exterior Paint
C = Premium AAON Gray Paint Exterior Paint +
Interior Corrosion Protection
E = Premium Gray Paint Exterior Paint + Shrink
Wrap
F = Premium Gray Paint Exterior Paint + Interior
Corrosion Prot Shrink Wrap
X = SPA + Premium AAON Gray Paint Exterior
Paint
Y = SPA + Premium AAON Gray Paint Exterior
Paint + Interior Corrosion Protection
1 = SPA + Premium AAON Gray Paint Exterior
Paint + Shrink Wrap
2 = SPA + Premium AAON Gray Paint Exterior
Paint + Interior Corrosion Prot Shrink
Wrap
4 = SPA + Special Exterior Paint Color
5 = SPA + Special Exterior Paint Color + Interior
Corrosion Protection
7 = SPA + Special Exterior Paint Color + Shrink
Wrap
8 = SPA + Special Exterior Paint Color + Interior
Corrosion Prot Shrink Wrap
Содержание RQ NextGen Series
Страница 2: ......
Страница 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Страница 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Страница 86: ...86 Figure 35 Example 2 6 ton through the Base Gas Piping Note RQ units will only contain one Heat Exchanger...
Страница 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Страница 95: ...95...
Страница 96: ...96...
Страница 105: ...105 Maintenance Log E Coated Coil...
Страница 107: ...107...