
7
Start-up
7.1
Prerequisites for commissioning
Caution!
1. You must mount and connect the device in accordance with the operating instructions.
2. Double check that all connections are correct.
3. The mains voltage must match the information on the rating plate.
4. Make sure that no persons or objects are in the fan's hazardous area.
7.2
Procedure for commissioning
Sequence
Setting
1
"
Check connection and close housing carefully.
2
"
Turn on mains voltage.
Display after
fi
rst turning on the mains voltage
3
Use key
|
ESC
|
to switch to the main menu
4
Menu group:
Start
"
Set the menu language if necessary (factory setting English = Language GB).
"
The display can be switched between SI units (US units = OFF) and imperial (US) units (US units = ON).
5
Menu group:
Base setup
"
Setting the desired operation Mode (factory setting
1.01
= Speed controller see selection Mode).
"
Further settings depend on the selected mode and the sensor / setting signal used.
Caution!
When saving the operating mode, the respective preset factory operating-mode setting is loaded. That means,
the settings you have made, e.g., in
“
IO setup
”
are lost. An exception: the menu language setting remains
preserved.
6
Menu group
Setting
:
"
Set the parameters for the control mode.
7
Press the On/Off key for approx 2 s to give the release (the display
|
STOP
|
disappears).
Information
Adjust further settings according to the desired function (see Operating Instructions / Programming).
Operating Instructions
UNIcon MODBUS Master
Start-up
L-BAL-E255-GB 1901 Index 001
Part.-No.
22/121