xiv
IM 05P02C41-01EN
8.4.1 Switching PID According to Target Setpoint Number (SPNO) .......................... 8-54
8.4.2 Switching PID According to PV ......................................................................... 8-55
8.4.3 Switching PID According to SP ......................................................................... 8-56
8.4.4 Switching PID According to Target SP .............................................................. 8-58
8.4.5 Switching PID According to Deviation (Reference Deviation) ........................... 8-60
8.4.6 Setting Hysteresis at Time of PID Switch ......................................................... 8-61
8.4.7 Switching PID Irrespective of Operation Mode ................................................. 8-61
8.4.8 Switching PID by Contact Input ........................................................................ 8-61
Adjusting Auto-tuning Operation
.................................................................................... 8-68
8.10 Setting SP Limiter ........................................................................................................... 8-69
8.11 Setting Program Time Unit ............................................................................................. 8-70
8.12 Forcing Local Setpoint (LSP) to Track Program Setpoint or Remote Setpoint (SP Tracking) . 8-71
8.13 Setting Controller Action at Power ON (Restart Mode) ......................................................................8-72
8.14 Setting Time between Powering on Controller and Starting Control (Restart Timer) ..... 8-73
Chapter 9 Program Pattern Functions
Setting the Setting Method of Program Pattern ................................................................ 9-1
9.1.1 Setting the Program Pattern Using the Segment Time ....................................... 9-2
9.1.2 Setting the Program Pattern using the Ramp-rate and Segment Time .............. 9-3
9.1.3 Setting the Program Time Unit ............................................................................ 9-5
PID Selection Method ....................................................................................................... 9-6
9.2.1 Segment PID Selection ....................................................................................... 9-6
9.2.2 Zone PID Selection ............................................................................................. 9-7
9.2.3 Local PID Selection ............................................................................................ 9-7
9.3.2 Ramp-prioritized PV start (STC=RAMP)
............................................................. 9-9
9.3.3 Time-prioritized PV start (STC=TIME)
.............................................................. 9-13
9.3.4 Starting operation at local target setpoint (STC=LSP) ...................................... 9-15
9.3.5 Starting operation at remote setpoint (STC=RSP)............................................ 9-17
Setting the Wait Functions ................................................................................................. 9-18
9.4.1 Program Wait at Segment End ......................................................................... 9-18
9.4.2 Program Wait in the Middle of a Segment ........................................................ 9-21
Setting Event Functions ......................................................................................................................9-26
9.7.1 PV Event ........................................................................................................... 9-27
9.7.2 Time Event ........................................................................................................ 9-28
9.7.3 Local Event ....................................................................................................... 9-30
Setting the Operation in Segment Switching ......................................................................................9-31
9.8.1 Switching for continuation (JC=CONT) ............................................................. 9-31
9.8.2 Hold-on switching (JC=HOLD) .......................................................................... 9-33
9.8.3 Local-mode switching (JC=LOCAL) .................................................................. 9-35
9.8.4 Remote-mode switching (JC=REM) ................................................................. 9-37
9.8.5 Segment switching (the controller switches to a local setpoint when
the segment is completed after release) (JC=W.SL1 to W.SL5)....................... 9-39
9.8.6 Segment switching (the controller switches to a remote setpoint when
the segment is completed after release) (JC=W.SR1 to W.SR5) ..................... 9-40
Contents
Summary of Contents for UTAdvanced UP55A
Page 3: ......
Page 21: ...Blank Page ...
Page 37: ...Blank Page ...
Page 47: ...Blank Page ...
Page 125: ...Blank Page ...
Page 147: ...Blank Page ...
Page 155: ...8 8 IM 05P02C41 01EN Intentionally blank 8 1 Setting Control Mode CTLM ...
Page 159: ...8 12 IM 05P02C41 01EN Intentionally blank 8 1 Setting Control Mode CTLM ...
Page 167: ...8 20 IM 05P02C41 01EN Intentionally blank 8 1 Setting Control Mode CTLM ...
Page 175: ...8 28 IM 05P02C41 01EN Intentionally blank 8 1 Setting Control Mode CTLM ...
Page 221: ...Blank Page ...
Page 275: ...Blank Page ...
Page 351: ...Blank Page ...
Page 381: ...Blank Page ...
Page 403: ...Blank Page ...
Page 491: ...Blank Page ...
Page 505: ......
Page 513: ...Blank Page ...
Page 515: ...Blank Page ...