
4-16
<4. Measurement Procedures>
IM 80J01A01-01E
Click
“Rec” button in case of restarting measurement.
(It takes about 2 minutes that
“Rec” button becomes available after
turning power switch ON.)
Note
In case that starting time of the next timepoint comes during the pausing time,
measurement starts again as following sequence.
①
Interval
Interval
Interval
Interval
Interval
Interval
Interval
Interval
Interval
①
①
Interval
Interval
Interval
②
③
④
⑤
②
②
③
③
④
④
⑤
⑤
Measuring
<Timepoint>
Interrupting
No interrupting
Interrupting time
is in interval
Interrupting time
is over interval
In case of the time-lapse measurement that pause for filling water and others is
supporsed, it is recommended to set interval so that time span from finishing
measurement of the timepoint to starting of next timepoint become longer than 10
minutes.
Summary of Contents for CQ1
Page 2: ...This document corresponds to the following versions of software Measurement software R1 04 ...
Page 8: ...vi IM 80J01A01 01E Right Side of Utility Box Aperture label ...
Page 24: ......
Page 34: ......
Page 48: ......
Page 177: ... 5 Functions of CQ1 Software 5 81 IM 80J01A01 01E Drag tab to move the window ...
Page 236: ......
Page 238: ......
Page 252: ...7 14 7 Trouble Shooting IM 80J01A01 01E Set sub cover and tighten 2 screws ...
Page 256: ......
Page 266: ......