
<2. Precautions for Use/Installation>
2-5
IM 80J01A01-01E
Level location
When installing this equipment, make sure the equipment does
not tilt.
Location of minimal soot, steam, dust, corrosive gases
and so on.
Location where electric power supply system of more than
AC100V, 14A (1,400W) is available.
※
1
Subjecting the equipment to a sudden temperature shift may cause condensation.
Installation Environment
Operating Temperature Range
CQ1: 15
– 35
℃
Gas Mixer: 20
– 35
℃
Operating Humidity Range
CQ1: 20
– 70 % RH, non-condensing
Gas Mixer: 10
– 85 % RH, non-condensing
Summary of Contents for CQ1
Page 2: ...This document corresponds to the following versions of software Measurement software R1 04 ...
Page 8: ...vi IM 80J01A01 01E Right Side of Utility Box Aperture label ...
Page 24: ......
Page 34: ......
Page 48: ......
Page 177: ... 5 Functions of CQ1 Software 5 81 IM 80J01A01 01E Drag tab to move the window ...
Page 236: ......
Page 238: ......
Page 252: ...7 14 7 Trouble Shooting IM 80J01A01 01E Set sub cover and tighten 2 screws ...
Page 256: ......
Page 266: ......