
<3. Name of Each Part/Starting and Shutting Down the Equipment>
3-13
IM 80J01A01-01E
3.3
Starting and Shutting Down of Gas Mixer (Option)
3.3.1
Starting Gas Mixer
(1) Confirm that valve
③
of regulator is closed.
(2) Confirm that valve
②
is loosened by slight counterclockwise
rotating.
(3) Open valve
①
of gas cylinder.
(4) Open valve
③
of regulator.
(5) By clockwise rotating valve
②
, adjust outlet pressure (meter B) to
be in the range of 0.1 MPa
– 0.15 MPa.
(6) Turn the power switch of Gas Mixer.
3.3.2
Shutting Down Gas Mixer
(1) Close valve
③
of regulator to stop gas supply. (If the gas cylinder
will not be used for long time, close valve
①
of gas cylinder after
closing valve
③
.)
(2) Turn the power switch of Gas Mixer.
①
②
③
Meter B
Meter A
Power Switch
Summary of Contents for CQ1
Page 2: ...This document corresponds to the following versions of software Measurement software R1 04 ...
Page 8: ...vi IM 80J01A01 01E Right Side of Utility Box Aperture label ...
Page 24: ......
Page 34: ......
Page 48: ......
Page 177: ... 5 Functions of CQ1 Software 5 81 IM 80J01A01 01E Drag tab to move the window ...
Page 236: ......
Page 238: ......
Page 252: ...7 14 7 Trouble Shooting IM 80J01A01 01E Set sub cover and tighten 2 screws ...
Page 256: ......
Page 266: ......