4-8
POWR
TR
PRIMARY SHEAVE AND DRIVE V-BELT
• Tighten the spider to specification using the bar
wrench
3
.
CAUTION:
The spider has a left-handed thread.
WARNING
• Do not operate the primary sheave until the
LOCTITE
®
has dried completely. Wait 24
hours before operating the primary sheave.
• Since a high torque is required to tighten the
spider, make sure the spider, fixed sheave,
and special tool are well secured. Tighten the
spider carefully to prevent cracks and dam-
age to the sheaves and spider.
T
R
.
.
Spider:
200 Nm (20.0 m · kg, 145 ft · lb)
5. Install:
• Weight
• Bolts
1
• Nuts
2
• Set bolt
3
NOTE:
To maintain the primary sheave balance, the bolts
1
must be installed with their threaded portions
pointing in a counterclockwise direction, as illus-
trated.
6. Install:
• Primary sheave spring
1
• Primary sheave cap
2
NOTE:
Be sure the sheave cap match mark (X) is aligned
with the spider match mark (X).
T
R
.
.
Nut:
6 Nm (0.6 m · kg, 4.3 ft · lb)
Set bolt:
4 Nm (0.4 m · kg, 2.9 ft · lb)
LOCTITE
®
T
R
.
.
Primary sheave cap bolt:
14 Nm (1.4 m · kg, 10 ft · lb)
2
3
LT
1
1
Summary of Contents for RS90RK
Page 2: ......
Page 8: ......
Page 65: ...INSP ADJ ...
Page 158: ...2 57 INSP ADJ CARBURETOR TUNING Guide for carburetion ...
Page 195: ...INSP ADJ ...
Page 659: ... ELEC ...
Page 721: ... ELEC ...
Page 816: ...9 33 SPEC CABLE ROUTING 1 7 2 3 4 6 5 A A A A ...
Page 824: ...9 41 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 826: ...9 43 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 828: ...9 45 SPEC CABLE ROUTING A B B 1 2 3 4 5 6 7 8 9 0 A B 9 C 0 D E G F B B A ...
Page 830: ...9 47 SPEC CABLE ROUTING 1 5 2 3 4 A B 6 5 7 8 9 0 A C A A B B B A A B ...
Page 832: ...9 49 SPEC CABLE ROUTING A A 7 1 2 3 4 6 5 ...
Page 834: ...9 51 SPEC CABLE ROUTING 1 2 3 4 5 6 7 5 B B A A 8 9 4 4 A A B B ...
Page 836: ......
Page 839: ......