11 Installation: Part 2 (Electrical power)
11.1 Identification of electrical power required
11.2 Alternating current (AC) power
11.2.1 Power specification requirements
11.2.4 Cable (wiring) specification
11.2.5 Pre-electrical installation requirement checklist
11.2.6 Connect to AC Power supply
11.2.7 Earth continuity testing using the earth bond test point
11.3 Direct current (DC) power
11.3.1 Power specification requirements
11.3.5 Pre-electrical installation checklist
11.3.6 Connecting to a DC power supply
11.4 Testing of electrical power and first time pump start up
11.4.2 Model: Manual, PROFIBUS, Universal, Un
11 INSTALLATION: PART 2 (ELECTRICAL POWER)
55