9
Installation overview
The installation section, is provided in the following order.
1. Installation: Part 1 (Physical)
2. Installation: Part 2 (Electrical power)
3. Installation: Part 3 (Fluid path)
4. Installation: Part 4 (Control system connections and wiring)
5. Installation: Part 5 (Setting the pump up (general))
6. Installation: Part 6 (Setting the pump up (specific - control system))
Follow the installation in the order above. This is to ensure the pump:
l
Cannot topple over after installation of the pumphead,
l
Cannot be tilted beyond 20 degrees (maximum slope of installation).
l
Has electrical power prior to the first time pumphead installation procedure, and general set up of
pump.
9 INSTALLATION OVERVIEW
47